-
April 25-26,
2007 EXOKO PRECISIONWALL™ exhibits at the 2007 SWPSC in
Lubbock, TX at Texas Tech University.
-
April 1-2,
2007 EXOKO PRECISIONWALL™ exhibits at the SPE Production &
Operations Symposium in Oklahoma City, OK at the Cox Center.
-
March 5-8,
2007 EXOKO PRECISIONWALL™ exhibits at the Gas Well
Dewatering Workshop in Denver, CO at the Adams Mark Hotel
Downtown.
-
January 2007
EXOKO prepares for deeper installations with the release of
the 100-4100 model to production. Field installations in
both the U.S. and Canada are under review.
-
November 2006
EXOKO continues field deployment of the 100-2100 model with
an operator in Central Kansas.
-
July 2006,
EXOKO finalizes base performance testing establishing
interference/clearance requirements for optimum performance
in typical coalbed Methane and Gas well dewatering
applications.
-
June 2006,
EXOKO initiates work with a top Urethane processing company
in deployment of a proprietary Urethane for downhole
applications.
-
May 2006,
EXOKO exhibits at the 2006 Offshore Technology Conference in
Houston, TX.
-
March 2006,
EXOKO exhibits at the Gas Well Dewatering Workshop in
Denver, CO. EXOKO presents the zero interference performance
test results to all workshop attendees.
-
January 2006,
EXOKO begins performance testing of various Urethanes with
different interferences fits. Performance results indicate
the "Precision" of the composite manufacturing process
allows for far less interference than anticipated.
-
September
2005, EXOKO pioneers coating rotors with Urethane. Using an
array of Urethane formulations and various durometer
hardnesses, EXOKO works with leading Urethane specialists to
develop the coating processes.